The longest ship ever built in Canada, at close to 174 metres in length, the future Protecteur-class Joint Support Ships (JSS) will provide core replenishment, limited sealift capabilities and support to operations ashore for the Royal Canadian Navy (RCN).
The two new ships are currently under construction with the first, future His Majesty’s Canadian Ship (HMCS) Protecteur, expected to be delivered to the RCN in 2025. Protecteur will be the lead ship of the class, and the second will be named HMCS Preserver. Protecteur will remain on the West Coast, with Preserver destined for Halifax.
View Full Article Here